Independent coverage passes
The second application closes the wearing surface after the first coat has established a continuous base, reducing dependence on one heavy pass.
WP10 is defined by two smooth 0.5 mm epoxy coats, producing a nominal 1 mm waterproofing build. The separate applications provide continuous coverage rather than treating a thin primer as the finished barrier. The resin system is placed over a properly prepared base, while penetrations, wall returns and movement joints receive compatible details. Its purpose is liquid control within the room, not simply surface colour.
The second application closes the wearing surface after the first coat has established a continuous base, reducing dependence on one heavy pass.
A planned perimeter and penetration layout allows the horizontal floor coating to connect with the rest of the room's liquid-control measures.
The exposed resin avoids a coarse broadcast profile, making residue easier to see and remove around utility equipment.
| Chemistry | High-solids epoxy |
|---|---|
| Total Coating Build | 1.0 mm |
| Coat Thickness | 0.5 mm per smooth coat |
| Minimum Coat Count | Two for waterproofing |
| Finish | Smooth continuous resin |
| Theoretical Coverage | Approximately 1.9 m²/L per 0.5 mm coat |
| Component Ratio | 1:1 by volume |
| Application Temperature | 10-30 °C |
| Substrate | Prepared and compatible primed base |
| Customization (Kustomisasi) | Tersedia berdasarkan aplikasi yang dimaksudkan dan lingkungan operasi. |
Suitable for enclosed wet utility areas and controlled rooms where incidental liquids must be kept above the concrete. The waterproof floor package should include outlets, upstands and joints; an intact field coating alone does not make an open doorway or unsealed pipe penetration watertight.
Specify both smooth coats and their combined thickness separately from any primer.
Detail compatible seals around penetrations and maintain those details during equipment replacement.
Select clear or pigmented finish, cove connections and compatible joint treatment. Plan any drainage falls in the base before coating so the smooth barrier does not leave unwanted pools.
Kirimkan kami dimensi Anda, kondisi instalasi, target kinerja dan permukaan akhir yang diperlukan.