클린룸 장비 및 무균 시설 필수품의 원스톱 공급업체국제 프로젝트 지원
Open mobile navigationClose mobile navigation
/ 제품 / Cleanroom Flooring / Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled
STJH-HEAVY-DUTY-EPOXY-MORTAR-FLOORING-SC46

Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled

A compacted epoxy screed for heavily used routes where the floor needs a substantial mineral wearing body.
  • 4-6 mm compacted screed body
  • Hand or power-trowel placement
  • Suitable for designed falls and repair areas
견적 요청 제품 찾아보기

About This Product

SC46 combines epoxy binder, hardener and graded aggregate into a trowelable mortar. Installed at 4-6 mm, the mixture is compacted by hand or power trowel and finished with a compatible seal. The construction can follow designed falls and local changes of level instead of flowing back to a flat surface. It is the general sealed mortar option in this family, without the separate traction broadcast of SR46.

주요 기능

Placement on shaped floors

The mortar consistency permits deliberate slope formation at approaches and local transitions that a free-flowing topping cannot easily hold.

Compacted aggregate skeleton

Trowelling closes the material around the mineral grains, supporting repeated mechanical loading when bonded to a sound base.

Sealed exposed surface

A compatible finishing coat closes residual mortar porosity and creates the face that cleaning equipment contacts in service.

기술 매개변수

Binder SystemThree-component epoxy screed
Nominal Thickness4-6 mm
Aggregate FormGraded mineral aggregate
Placement MethodHand or power trowel
Surface ConstructionCompacted mortar with compatible seal
Finished GeometryFlat areas, ramps and formed falls
SubstratePrepared load-bearing concrete
DutyHeavy internal industrial traffic
Edge TreatmentCompatible mortar cove or formed termination
사용자 정의의도된 응용 프로그램 및 운영 환경에 따라 사용할 수 있습니다.

Applications

Use for equipment transfer routes, heavy clean manufacturing aisles and repaired loading points. The mortar is particularly useful where surface shape needs to be retained. Wheel load, turning action and the strength of the original concrete should guide the extent of local repair beneath the new system.

Solutions for Your Application

A damaged aisle requires more than a thin protective film.

Repair unsound concrete and install the specified compacted mortar depth across the loaded route.

A smooth-flowing overlay would lose a carefully formed ramp.

Use trowelled placement to maintain the ramp geometry while consolidating the screed.

사용 가능한 옵션

Specify seal type, cove height and the intended fall profile. Large open areas may suit power-trowel placement, with hand finishing reserved for perimeters and obstructions.

Planning a Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled specification?

치수, 설치 조건, 성능 목표 및 필요한 표면 마감을 보내십시오.

우리 팀과 대화하십시오.
저희에게 이메일 whatsapp WeChat

제품

뉴스

회사 소개

문의하기