Pembekal Satu Henti Anda untuk Peralatan Bilik Bersih dan Kemudahan AseptikSokongan Projek Antarabangsa
Open mobile navigationClose mobile navigation
Laman Utama / Produk / Cleanroom Flooring / Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled
STJH-HEAVY-DUTY-EPOXY-MORTAR-FLOORING-SC46

Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled

A compacted epoxy screed for heavily used routes where the floor needs a substantial mineral wearing body.
  • 4-6 mm compacted screed body
  • Hand or power-trowel placement
  • Suitable for designed falls and repair areas
Permintaan sebut harga Semak imbas produk

About This Product

SC46 combines epoxy binder, hardener and graded aggregate into a trowelable mortar. Installed at 4-6 mm, the mixture is compacted by hand or power trowel and finished with a compatible seal. The construction can follow designed falls and local changes of level instead of flowing back to a flat surface. It is the general sealed mortar option in this family, without the separate traction broadcast of SR46.

Ciri-ciri Utama

Placement on shaped floors

The mortar consistency permits deliberate slope formation at approaches and local transitions that a free-flowing topping cannot easily hold.

Compacted aggregate skeleton

Trowelling closes the material around the mineral grains, supporting repeated mechanical loading when bonded to a sound base.

Sealed exposed surface

A compatible finishing coat closes residual mortar porosity and creates the face that cleaning equipment contacts in service.

Parameter teknikal

Binder SystemThree-component epoxy screed
Nominal Thickness4-6 mm
Aggregate FormGraded mineral aggregate
Placement MethodHand or power trowel
Surface ConstructionCompacted mortar with compatible seal
Finished GeometryFlat areas, ramps and formed falls
SubstratePrepared load-bearing concrete
DutyHeavy internal industrial traffic
Edge TreatmentCompatible mortar cove or formed termination
PenyesuaianBoleh didapati berdasarkan aplikasi yang dimaksudkan dan persekitaran operasi.

Applications

Use for equipment transfer routes, heavy clean manufacturing aisles and repaired loading points. The mortar is particularly useful where surface shape needs to be retained. Wheel load, turning action and the strength of the original concrete should guide the extent of local repair beneath the new system.

Solutions for Your Application

A damaged aisle requires more than a thin protective film.

Repair unsound concrete and install the specified compacted mortar depth across the loaded route.

A smooth-flowing overlay would lose a carefully formed ramp.

Use trowelled placement to maintain the ramp geometry while consolidating the screed.

Pilihan yang boleh didapati

Specify seal type, cove height and the intended fall profile. Large open areas may suit power-trowel placement, with hand finishing reserved for perimeters and obstructions.

Planning a Heavy-Duty Epoxy Mortar Flooring 4–6 mm Power-Trowelled specification?

Hantarkan kepada kami dimensi anda, syarat pemasangan, sasaran prestasi dan kemasan permukaan yang diperlukan.

Berbincang dengan pasukan kami
Email Kami WhatsApp WeChat

Laman Utama

Produk

Berita

Tentang Kami

Hubungi Kami