Temiz Oda Ekipmanları ve Aseptik Tesis Temelleri için Tek Duraklı TedarikçinizUluslararası Proje Destekleri
Open mobile navigationClose mobile navigation
Ana Sayfa / Ürünler / Cleanroom HVAC Systems / Resistive Steam Humidifier 80 kg/h
STJH-RESISTIVE-STEAM-HUMIDIFIER-80KGH

Resistive Steam Humidifier 80 kg/h

The largest resistive cabinet in the range for high-output, precisely modulated clean-facility steam delivery.
  • 80 kg/h maximum series output
  • Large immersion-element bank
  • Precision modulating control
Alıntı isteği Browse ürünleri

Ürün tanıtımı

The large housing reaches the top of the referenced 5-80 kg/h resistive series. Its high-capacity vessel and element bank are physically larger than the medium model and intended for central clean manufacturing or healthcare air systems. Resistive heating preserves accurate modulation at high output, but electrical demand, steam hose or manifold capacity and scale service access must all be designed for the full 80 kg/h duty.

Ana Özellikler

Maximum family capacity

One large cabinet delivers the highest documented steam output in the resistive range.

Water-independent power control

Element output is regulated electrically rather than by the changing conductivity of cylinder water.

Central-system suitability

The large vessel supports full AHU or multi-manifold humidification duty.

Teknik parametreler

Steam Output80 kg/h
Series Range5-80 kg/h
Housing SizeLarge
Heating MethodResistive immersion elements
ControlPrecision modulation
Water ManagementAutomatic fill, drain and scale handling
Electrical DemandSized to selected voltage and output
DistributionHigh-capacity duct manifold
Primary DutyLarge clean-facility humidity control
Customization (Özelleşme)Kullanılan uygulama ve çalışma ortamına göre kullanılabilir.

Applications

For large clean manufacturing, healthcare and central air systems that need up to 80 kg/h with precise isothermal control.

Solutions for Your Application

The high steam rate condenses because one short manifold cannot distribute it evenly.Use a properly sized multi-tube grid and calculate absorption distance at worst-case duct conditions.
The large heater bank causes an uncontrolled electrical demand peak.Coordinate modulation, staged limits and facility demand management with the selected voltage and output.

Mevcut Seçenekler

Confirm maximum and minimum steam loads, voltage, water treatment, element staging, distribution grid, drains, BMS and service clearance.

Planning a Resistive Steam Humidifier 80 kg/h specification?

Bize boyutlarınızı, montaj koşullarınızı, performans hedeflerinizi ve gerekli yüzey kaplamalarınızı gönderin.

Ekibimizle konuşun
E-posta Bize whatsapp WeChat

Ana Sayfa

Ürünler

Haberler

Hakkımızda

İletişim