موردك الموحد لمعدات الغرف النظيفة وأساسيات المرافق العقليةدعم المشاريع الدولية
Open mobile navigationClose mobile navigation
الرئيسية / المنتجات / Cleanroom HVAC Systems / Resistive Steam Humidifier 80 kg/h
STJH-RESISTIVE-STEAM-HUMIDIFIER-80KGH

Resistive Steam Humidifier 80 kg/h

The largest resistive cabinet in the range for high-output, precisely modulated clean-facility steam delivery.
  • 80 kg/h maximum series output
  • Large immersion-element bank
  • Precision modulating control
طلب عرض أسعار تصفح المنتجات

مقدمة المنتج

The large housing reaches the top of the referenced 5-80 kg/h resistive series. Its high-capacity vessel and element bank are physically larger than the medium model and intended for central clean manufacturing or healthcare air systems. Resistive heating preserves accurate modulation at high output, but electrical demand, steam hose or manifold capacity and scale service access must all be designed for the full 80 kg/h duty.

الخصائص الرئيسية

Maximum family capacity

One large cabinet delivers the highest documented steam output in the resistive range.

Water-independent power control

Element output is regulated electrically rather than by the changing conductivity of cylinder water.

Central-system suitability

The large vessel supports full AHU or multi-manifold humidification duty.

المعلمات الفنية

Steam Output80 kg/h
Series Range5-80 kg/h
Housing SizeLarge
Heating MethodResistive immersion elements
ControlPrecision modulation
Water ManagementAutomatic fill, drain and scale handling
Electrical DemandSized to selected voltage and output
DistributionHigh-capacity duct manifold
Primary DutyLarge clean-facility humidity control
التخصيصمتوفر على أساس التطبيق المقصود وبيئة التشغيل.

Applications

For large clean manufacturing, healthcare and central air systems that need up to 80 kg/h with precise isothermal control.

Solutions for Your Application

The high steam rate condenses because one short manifold cannot distribute it evenly.Use a properly sized multi-tube grid and calculate absorption distance at worst-case duct conditions.
The large heater bank causes an uncontrolled electrical demand peak.Coordinate modulation, staged limits and facility demand management with the selected voltage and output.

الخيارات المتاحة

Confirm maximum and minimum steam loads, voltage, water treatment, element staging, distribution grid, drains, BMS and service clearance.

Planning a Resistive Steam Humidifier 80 kg/h specification?

أرسل لنا الأبعاد الخاصة بك، شروط التثبيت، أهداف الأداء والتشطيب السطحي المطلوب.

تحدث مع فريقنا
E البريد الإلكتروني لنا WhatsApp WeChat

الرئيسية

المنتجات

الأخبار

من نحن

اتصل بنا