Your One-Stop Supplier for Cleanroom Equipment and Aseptic Facility EssentialsInternational Project Support
Open mobile navigationClose mobile navigation
Home / Products / Cleanroom Equipment / Suit Wet-Down Shower 8 L/min Fixed
STJH-LOW-FLOW-SUIT-WET-DOWN-8LPM

Suit Wet-Down Shower 8 L/min Fixed

A fixed fine-mist cubicle that wets contaminated protective clothing while limiting wastewater volume.
  • 8 L/min water demand
  • 1110 x 1300 mm footprint
  • Permanent walk-through installation
Request a Quote Browse Products

Product Introduction

This walk-through unit applies an 8 L/min mist to damp full-body PPE before controlled removal. Its 1110 x 1300 x 2400 mm enclosure suits a permanent exit point, while the 1/2 in water connection and 2.8 bar minimum supply define the utility requirement. It is intended as a garment wet-down stage, not as an emergency drench shower for exposed skin.

Key Features

Low-effluent misting

Fine droplets bind surface contamination with much less water than a high-volume deluge.

Defined utility load

An 8 L/min flow and 2.8 bar minimum pressure simplify water and drainage sizing.

Enclosed exit step

The cubicle keeps the wet-down action inside a dedicated boundary before PPE doffing.

Technical Parameters

External Dimensions1110 W x 1300 D x 2400 H mm
Water Flow8 L/min
Minimum Water Pressure2.8 bar
Water Inlet1/2 in male connection
Nominal Weight80 kg
Support ConstructionGalvanised frame and supports
EnclosurePanelled walk-through cubicle
ActivationManual or automatic fine-mist cycle
Process FunctionProtective-suit wet-down before doffing
CustomizationAvailable based on the intended application and operating environment.

Applications

For pharmaceutical laboratories, powder packaging rooms and controlled maintenance exits where PPE must be damped before removal. Confirm compatible wetting fluid, collection capacity and the downstream doffing procedure.

Solutions for Your Application

A conventional shower would create more contaminated effluent than the drain system can manage.Use the 8 L/min mist duty and size the collection route around the actual cycle duration.
Operators may mistake garment wet-down for an emergency body shower.Keep emergency drench equipment separate and label this cubicle for PPE processing only.

Available Options

Specify manual or automatic initiation, enclosure finish, door arrangement, mist-fluid compatibility and drain connection. Verify supply pressure at peak site demand.

Planning a Suit Wet-Down Shower 8 L/min Fixed specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Email Us WhatsApp WeChat

Home

Products

News

About Us

Contact Us