클린룸 장비 및 무균 시설 필수품의 원스톱 공급업체국제 프로젝트 지원
Open mobile navigationClose mobile navigation
/ 제품 / Cleanroom Flooring / Static-Dissipative Epoxy Flooring 2–4 mm Self-Leveler
STJH-STATIC-DISSIPATIVE-EPOXY-FLOORING-SL24

Static-Dissipative Epoxy Flooring 2–4 mm Self-Leveler

A smooth self-smoothing epoxy system using a 3 mm nominal build for controlled static dissipation.
  • 3 mm nominal supported construction
  • Copper tape beneath ESD primer
  • Smooth static-dissipative wearing course
견적 요청 제품 찾아보기

About This Product

SL24 combines a primed concrete base, copper earthing tape, an ESD primer and a filled epoxy wearing layer at a nominal 3 mm build. Its smooth gloss face is intended for clean production where a static-dissipative floor is required. The floor is a coordinated resin system, with the conductive fillers and buried earthing components performing different roles. The mineral-filled wearing course supplies the continuous surface above the concealed grounding network.

주요 기능

Filled self-smoothing body

Conductive filler is dispersed through the epoxy mix so the wearing layer provides an even surface with integral static-control function.

Planned earthing network

Copper tape connects the coated area to the designated ground path before the final layer makes those components inaccessible.

Cleanable exposed finish

The continuous gloss face avoids a granular broadcast texture, supporting precise equipment movement and routine residue removal.

기술 매개변수

BinderEpoxy resin with conductive fillers
Nominal Build3 mm
Primer SequenceBase primer followed by ESD primer
Earthing MaterialCopper tape
Wearing CourseSelf-smoothing filled epoxy
SurfaceSmooth gloss
Electrical FunctionStatic dissipative
Wearing-Layer ConsumptionApproximately 6 kg/m² at 3 mm
BaseSound prepared concrete
사용자 정의의도된 응용 프로그램 및 운영 환경에 따라 사용할 수 있습니다.

Applications

Consider SL24 for laboratories, electronics production and pharmaceutical processing support. The selected footwear and maintenance materials should suit the floor's static-control purpose. Avoid using the finish as a substitute for other necessary controls within a static-sensitive workstation.

Solutions for Your Application

The earthing layout might be missed before the floor is finished.

Install the copper tape and ESD primer as explicit stages before the self-smoothing layer.

A thin coating is inadequate for the desired smooth floor body.

Use the nominal 3 mm filled construction over a repaired and level base.

사용 가능한 옵션

Specify colour, cove interface and grounding points. Use compatible perimeter materials and transition details that maintain a continuous, cleanable junction with adjoining floor finishes.

Planning a Static-Dissipative Epoxy Flooring 2–4 mm Self-Leveler specification?

치수, 설치 조건, 성능 목표 및 필요한 표면 마감을 보내십시오.

우리 팀과 대화하십시오.
저희에게 이메일 whatsapp WeChat

제품

뉴스

회사 소개

문의하기