클린룸 장비 및 무균 시설 필수품의 원스톱 공급업체국제 프로젝트 지원
Open mobile navigationClose mobile navigation
/ 제품 / Cleanroom HVAC Systems / Heat-Pipe Energy Recovery Unit Over-Under Single-Season
STJH-HEAT-PIPE-ENERGY-RECOVERY-OVERUNDER

Heat-Pipe Energy Recovery Unit Over-Under Single-Season

A stacked-air-stream thermosiphon that transfers heat strongly in one selected seasonal direction.
  • Over-under air paths
  • Passive vertical thermosiphon
  • Single-season recovery bias
견적 요청 제품 찾아보기

상품 소개

This heat-pipe unit places one air stream above the other and uses vertical 1/2 in copper tubes as a passive thermosiphon. Gravity-assisted liquid return creates strong transfer in one selected direction, so the circuit is optimized for either a dominant heating or cooling season rather than equal bidirectional duty. The stacked housing is especially suitable where supply and exhaust ducts already run over and under each other.

주요 기능

Gravity-assisted circulation

Vertical tubes return condensed working fluid to the evaporator without a mechanical pump.

Stacked duct integration

One coil face sits in each over-under air stream across a sealed partition.

Strong one-way recovery

Orientation is selected around the dominant annual heating or cooling benefit.

기술 매개변수

Air-Stream ArrangementOver-under
Recovery BiasSingle-season one-way
Tube Outside Diameter1/2 in copper
OperationPassive thermosiphon
Tube OrientationVertical
Air SeparationSealed stacked partition
Energy TransferSensible
Moving PartsNone
Primary DutyDominant heating or cooling season
사용자 정의의도된 응용 프로그램 및 운영 환경에 따라 사용할 수 있습니다.

Applications

For clean facilities with stacked ducts and a dominant heating or cooling season requiring separated-stream passive recovery.

Solutions for Your Application

The thermosiphon is selected for the wrong seasonal heat-flow direction.Define the dominant recovery mode and place the evaporator below the condenser for that condition.
Field tilt or casing settlement disrupts gravity return.Provide level structural support and verify vertical tube orientation during commissioning.

사용 가능한 옵션

Specify dominant season, supply and exhaust positions, rows, fin density, casing, coatings, partition, bypass and freeze protection.

Planning a Heat-Pipe Energy Recovery Unit Over-Under Single-Season specification?

치수, 설치 조건, 성능 목표 및 필요한 표면 마감을 보내십시오.

우리 팀과 대화하십시오.
저희에게 이메일 whatsapp WeChat

제품

뉴스

회사 소개

문의하기