Dual steam generation
Two cylinders expand total capacity and provide staged operation across a wider load range.
The 91 kg/h cabinet contains two independent steam cylinders and two control circuits, with maximum electrical input of 74.8 kW. The dual arrangement increases output beyond the single-cylinder range and can support two-zone delivery or staged capacity. Water conductivity, electrical load and steam-distribution geometry must be checked for both circuits so the large unit does not simply transfer a sizing problem to the duct.
Two cylinders expand total capacity and provide staged operation across a wider load range.
Independent control sections can serve separated distribution duties when configured accordingly.
One enclosure concentrates high steam output for central cleanroom air systems.
| Steam Output | 9-91 kg/h |
|---|---|
| Maximum Input | 74.8 kW |
| Steam Cylinders | 2 |
| Control Circuits | 2 |
| Heating Principle | Electrode boiling |
| Electrical Supply | Three-phase by selected voltage |
| Feed Water | Conductive potable water |
| Distribution | One or two steam delivery circuits by design |
| Primary Duty | Large clean-facility humidification |
| 사용자 정의 | 의도된 응용 프로그램 및 운영 환경에 따라 사용할 수 있습니다. |
For large clean manufacturing AHUs, hospital systems and two-zone steam distribution requiring up to 91 kg/h.
Confirm total and zone steam loads, voltage, cylinder control, water conductivity, dual manifolds, hose routing, drainage and BMS interface.
치수, 설치 조건, 성능 목표 및 필요한 표면 마감을 보내십시오.