Dual steam generation
Two cylinders expand total capacity and provide staged operation across a wider load range.
The 91 kg/h cabinet contains two independent steam cylinders and two control circuits, with maximum electrical input of 74.8 kW. The dual arrangement increases output beyond the single-cylinder range and can support two-zone delivery or staged capacity. Water conductivity, electrical load and steam-distribution geometry must be checked for both circuits so the large unit does not simply transfer a sizing problem to the duct.
Two cylinders expand total capacity and provide staged operation across a wider load range.
Independent control sections can serve separated distribution duties when configured accordingly.
One enclosure concentrates high steam output for central cleanroom air systems.
| Steam Output | 9-91 kg/h |
|---|---|
| Maximum Input | 74.8 kW |
| Steam Cylinders | 2 |
| Control Circuits | 2 |
| Heating Principle | Electrode boiling |
| Electrical Supply | Three-phase by selected voltage |
| Feed Water | Conductive potable water |
| Distribution | One or two steam delivery circuits by design |
| Primary Duty | Large clean-facility humidification |
| Penyesuaian | Boleh didapati berdasarkan aplikasi yang dimaksudkan dan persekitaran operasi. |
For large clean manufacturing AHUs, hospital systems and two-zone steam distribution requiring up to 91 kg/h.
Confirm total and zone steam loads, voltage, cylinder control, water conductivity, dual manifolds, hose routing, drainage and BMS interface.
Hantarkan kepada kami dimensi anda, syarat pemasangan, sasaran prestasi dan kemasan permukaan yang diperlukan.