Nhà cung cấp một cửa của bạn cho thiết bị phòng sạch và thiết bị vô trùng cơ sở thiết yếuHỗ trợ dự án quốc tế
Open mobile navigationClose mobile navigation
Trang chủ / Sản phẩm / Cleanroom Flooring / Stainless Steel Cleanroom Floor Movement Joint 304 with Replaceable TPE Insert
STJH-STAINLESS-STEEL-CLEANROOM-FLOOR-MOVEMENT-JOINT-TPE-INSERT-304

Stainless Steel Cleanroom Floor Movement Joint 304 with Replaceable TPE Insert

Paired stainless rails surround a replaceable flexible center for movement and edge protection.
  • AISI 304 side profiles
  • Replaceable flexible center
  • Perforated anchoring legs
Yêu cầu báo giá Duyệt các sản phẩm

About This Product

This joint combines two AISI 304 anchoring profiles with a soft thermoplastic-elastomer center. The metal sections protect the adjoining floor edges while the insert accommodates movement between them. For the replaceable-insert configuration, the selected profile heights start at 8 mm; the very shallow coating sections use a different detail and are not presented as interchangeable replacement-insert versions.

Các tính năng chính

Serviceable center strip

A damaged insert can be addressed separately from the metal rails when the selected section supports replacement.

Separated edge support

Each floor edge has its own anchoring profile, allowing the soft zone to remain functional between the supported sides.

Reduced rigid bridging

The flexible center interrupts a continuous rigid connection across the joint and can help limit impact-sound transfer.

Thông số kỹ thuật

Rail MaterialAISI 304 stainless steel
Flexible MaterialThermoplastic elastomer
Selected Movement Zone11 mm
Replaceable-Series Heights8-30 mm
Standard Length2500 mm
Anchoring LegsTrapezoid perforated
Center ServiceReplaceable insert
Floor InterfaceThin-bed tile or natural stone
Edge PositionFlush with or slightly below covering
Tùy chỉnhCó sẵn dựa trên ứng dụng dự định và môi trường hoạt động.

Applications

Suitable for consideration along movement lines in tiled clean corridors, industrial support rooms and hard-floor trolley routes. The profile must align with the joint beneath it; moving the surface strip away from the substrate joint would leave the floor unable to follow the intended movement path.

Solutions for Your Application

A damaged center strip requires extensive floor demolition.

Use the replaceable-insert section and retain access to the flexible zone for later maintenance.

Mortar fills the movement zone during installation.

Keep the center clear while fully embedding the anchoring legs so that edge support does not lock the joint.

Các tùy chọn có sẵn

Select profile height, insert color and junction pieces. Include wheel type and cleaning exposure in the inquiry, and use compatible intersections where several movement lines meet.

Planning a Stainless Steel Cleanroom Floor Movement Joint 304 with Replaceable TPE Insert specification?

Gửi cho chúng tôi kích thước của bạn, điều kiện lắp đặt, mục tiêu hiệu suất và bề mặt yêu cầu hoàn thiện.

Nói chuyện với đội ngũ của chúng tôi
Email cho chúng tôi WhatsApp WeChat

Trang chủ

Sản phẩm

Tin tức

Về chúng tôi

Liên hệ