Temiz Oda Ekipmanları ve Aseptik Tesis Temelleri için Tek Duraklı TedarikçinizUluslararası Proje Destekleri
Open mobile navigationClose mobile navigation
Ana Sayfa / Ürünler / Cleanroom HVAC Systems / Dry Room Air Handling Unit 3000 CFM
STJH-DRY-ROOM-AIR-HANDLING-UNIT-3000CFM

Dry Room Air Handling Unit 3000 CFM

A 3000 CFM desiccant dry-room AHU with a larger rotor, separate blowers and optional skid-mounted pre- and post-treatment sections.
  • 3000 CFM process airflow
  • Separate process and reactivation blowers
  • Optional treatment skid
Alıntı isteği Browse ürünleri

Ürün tanıtımı

This mid-range HCD system enlarges the rotor and uses separate process and reactivation blowers for a 3000 CFM duty. An HCD Plus skid can add filtration, cooling, heating and mixing around the dehumidification core for a battery pilot line or controlled pharmaceutical drying suite.

Ana Özellikler

Medium rotor capacity

The larger adsorption face handles the moisture load from a production suite rather than one local enclosure.

Independent air circuits

Dedicated blowers allow process and regeneration streams to be set for their different pressure requirements.

HCD Plus integration

Skid sections can condition temperature, filtration and mixing before or after the rotor.

Teknik parametreler

Nominal Process Air3000 CFM
DehumidifierMedium desiccant rotor
Blower ArrangementSeparate process and reactivation blowers
Reactivation HeatGas, steam or electric
Pre/Post TreatmentAvailable on integrated skid
Temperature ControlCooling and heating sections as selected
FiltrationMultiple process and regeneration stages
InstallationIndoor or outdoor
ControlsDew-point and airflow control options
Customization (Özelleşme)Rotor duty, treatment sequence and regeneration energy can be configured for the intended application and operating environment.

Applications

Lithium battery pilot lines, medium pharmaceutical drying suites, precision material storage and controlled low-humidity production rooms.

Solutions for Your Application

The dry room needs both low dew point and a tightly controlled supply temperature.Combine the rotor with skid-mounted precooling or postcooling and the appropriate heating section.
Process and reactivation ducts have different pressure losses.Select and control the separate blowers against their individual airflow and resistance schedules.

Mevcut Seçenekler

Gas, steam or electric regeneration, cooling and heating coils, high-grade filters, mixing section, dew-point sensors and remote controls are available.

Planning a Dry Room Air Handling Unit 3000 CFM specification?

Bize boyutlarınızı, montaj koşullarınızı, performans hedeflerinizi ve gerekli yüzey kaplamalarınızı gönderin.

Ekibimizle konuşun
E-posta Bize whatsapp WeChat

Ana Sayfa

Ürünler

Haberler

Hakkımızda

İletişim