Su proveedor de ventanilla única para equipos de sala limpia y elementos esenciales para instalaciones asépticasApoyo a proyectos internacionales
Open mobile navigationClose mobile navigation
Inicio / Productos / Cleanroom HVAC Systems / Heat-Pipe Energy Recovery Unit Heating-Optimized
STJH-HEAT-PIPE-ENERGY-RECOVERY-HEATING-OPTIMIZED

Heat-Pipe Energy Recovery Unit Heating-Optimized

A side-by-side Z-circuit biased toward winter heat recovery for cold-climate clean facilities.
  • Winter recovery bias
  • Side-by-side Z-circuit
  • Minimum 16-gauge frame
Solicite un presupuesto. Browse productos

Introducción del producto

This unit uses a side-by-side Z-circuit whose charge and internal geometry favor winter heating recovery while retaining some cooling-season transfer. Half-inch copper tubes sit in a minimum 16-gauge galvanized or stainless frame. The physical circuit differs from the equal bidirectional model and should be oriented for its intended dominant heat-flow direction; reversing the installation can reduce the winter benefit it was selected to provide.

Características clave

Cold-climate optimization

Circuit charge prioritizes heat transfer from winter exhaust to cold outdoor supply air.

Passive sealed tubes

Working fluid circulates inside 1/2 in copper tubes without pumps.

Robust section frame

Galvanized or stainless framing supports the two coil faces across the air-stream partition.

Parámetros técnicos

Air-Stream ArrangementSide by side
CircuitHeating-optimized Z-circuit
Recovery BiasWinter heating
Tube Outside Diameter1/2 in copper
FrameMinimum 16-gauge galvanized or stainless steel
OperationPassive heat pipe
Energy TransferSensible
InstallationOriented to dominant winter heat flow
Primary DutyCold-climate outdoor-air preheat
CustomizationDisponible según la aplicación prevista y el entorno operativo.

Applications

For cold-climate clean facilities with high winter outdoor-air heating loads and separated exhaust and supply paths.

Solutions for Your Application

The heating-biased circuit is installed backwards relative to winter air temperatures.Mark supply, exhaust and seasonal heat-flow orientation clearly and verify it before commissioning.
Frost develops on the exhaust-side face at low outdoor temperature.Model the frost threshold and provide bypass, preheat or staged airflow control.

Opciones disponibles

Confirm winter and summer conditions, rows, circuit orientation, fin spacing, coating, frame alloy, bypass and frost controls.

Planning a Heat-Pipe Energy Recovery Unit Heating-Optimized specification?

Envíenos sus dimensiones, condiciones de instalación, objetivos de rendimiento y acabado superficial requerido.

Habla con nuestro equipo
E-mail Nos WhatsApp WeChat

Inicio

Productos

Noticias

Nosotros

Contacto