クリーンルーム機器と無菌施設の必需品のワンストップサプライヤー国際プロジェクト支援
Open mobile navigationClose mobile navigation
ホーム / 製品 / Cleanroom HVAC Systems / Dry Room Air Handling Unit 12000 CFM
STJH-DRY-ROOM-AIR-HANDLING-UNIT-12000CFM

Dry Room Air Handling Unit 12000 CFM

A production-scale 12000 CFM dry-room AHU with a large desiccant rotor and multi-section process and reactivation cabinet.
  • 12000 CFM central process air
  • Large desiccant rotor
  • Multi-section modular construction
見積もりリクエスト 製品案内

商品紹介

The largest documented HCD endpoint is a central dry-air plant rather than a local dehumidifier. Its large rotor, process fan and regeneration sections deliver 12000 CFM to production-scale battery or moisture-sensitive manufacturing, with multi-section construction for treatment and transport.

主要な特徴

Production-scale dry-air supply

The high-volume process stream can serve an extensive dry room or a distributed low-humidity air system.

Large regeneration section

Gas, steam or electric energy can be sized to desorb the moisture load captured by the enlarged rotor.

Transportable section splits

Multi-section construction supports shipment, site assembly and separate access to major components.

技術的なパラメータ

Nominal Process Air12000 CFM
Moisture RemovalLarge desiccant rotor
ConstructionMulti-section modular cabinet
Process FanHigh-capacity dedicated section
Reactivation FanSeparate high-temperature air circuit
Reactivation HeatGas, steam or electric
Treatment AccessoriesCooling, heating, mixing and filtration options
InstallationIndoor or outdoor
ControlsCentral dew-point, temperature and airflow control
カスタマイズSection splits, target dew point and regeneration system can be configured for the intended application and operating environment.

Applications

Production-scale lithium battery dry rooms, central pharmaceutical drying plants and large moisture-sensitive manufacturing facilities.

Solutions for Your Application

Local dehumidifiers cannot maintain uniform low humidity across a large production room.Use the 12000 CFM central process stream with a balanced distribution and return-air strategy.
Large regeneration demand can dominate utility consumption.Select the available heat source and recovery or control strategy around the actual moisture load and operating schedule.

利用可能なオプション

Regeneration fuel, staged cooling and heating, filtration, process-air mixing, energy recovery, redundant sensors and central controls can be selected.

Planning a Dry Room Air Handling Unit 12000 CFM specification?

寸法、設置条件、性能目標、必要な表面仕上げをお送りください。

チームに相談する
メール送信 WhatsApp WeChat