Shorter working shutdown
The reactive binder supports a faster coating sequence, helping enclosed work areas return to their planned maintenance schedule.
TX08 combines a high-build epoxy resin with an aggregate-textured construction and a sealing application. Its nominal 0.8 mm selection sits within a 0.6-0.8 mm coating range, keeping the build shallow while introducing a more tactile face than a smooth gloss coating. The final texture depends on the selected aggregate and seal coverage, so those components are treated as a coordinated finish.
The reactive binder supports a faster coating sequence, helping enclosed work areas return to their planned maintenance schedule.
Selected aggregate introduces grip at the walking surface; seal application should retain the profile rather than flood its peaks.
Squeegee spreading and cross-rolling distribute the final resin around the aggregate, limiting exposed grit and uneven glossy patches.
| Binder | Two-part fast-curing epoxy |
|---|---|
| Nominal Build | 0.8 mm |
| Supported Thickness | 0.6-0.8 mm |
| Permukaan selesai | Slightly textured gloss |
| Texture Construction | Aggregate broadcast with epoxy seal |
| Resin Solids | Approximately 100% by volume |
| Mixed Resin Density | Approximately 1.48 kg/L at 20 °C |
| Placement Tools | Squeegee and short-pile roller |
| Service Environment | Interior medium-wear routes |
| Customization (Kustomisasi) | Tersedia berdasarkan aplikasi yang dimaksudkan dan lingkungan operasi. |
Consider this configuration for internal service corridors, clean support rooms and controlled wash areas where a textured surface is desirable. Drainage and cleaning remain important in wet use: aggregate texture cannot remove standing liquid or compensate for an unsuitable cleaning method.
Coordinate preparation, batch size and the fast-cure application sequence so each area is ready when the mixed resin arrives.
Set aggregate and seal consumption together, retaining the intended exposed surface profile.
Choose compatible aggregate grading and a solid colour that helps reveal tracked dirt. Keep the total build and final traction profile explicit when requesting the floor package.
Kirimkan kami dimensi Anda, kondisi instalasi, target kinerja dan permukaan akhir yang diperlukan.