STJH-PACKAGED-HOT-WATER-HEATING-UNIT-100GPM

Packaged Hot-Water Heating Unit 100 GPM

The largest skid in the group for high simultaneous process and sanitation hot-water demand.
  • 100 gpm hot-water output
  • 250 gpm boiler-side flow
  • 15 gpm recirculation pump
Запрос котировки Просмотреть продукты

Введение продукции

This package delivers 100 gpm of hot water using 250 gpm on the boiler side and a 15 gpm recirculation pump. The broader skid carries the largest exchanger and piping in the three-unit family, serving high-demand clean manufacturing and sanitation systems without a local storage tank. Stable performance depends on adequate heating-water temperature, distribution return balance and a realistic peak draw profile.

Основные характеристики

High simultaneous demand

The large exchanger supports the greatest hot-water draw among the three packaged units.

Factory-integrated station

Pumps, exchanger, controls and piping arrive as a coordinated instantaneous-heating package.

Large-loop temperature maintenance

A 15 gpm recirculation duty supports a wider distribution network between draw events.

Технические параметры

Hot-Water Flow100 gpm
Boiler-Water Flow250 gpm
Recirculation Flow15 gpm
ConfigurationFactory-packaged instantaneous heater
Heat ExchangerSized to selected temperature approach
Temperature ControlElectronic modulating package
PumpsHigh-flow boiler and recirculation duties
DistributionLarge process or sanitation loop
StorageInstantaneous; no integral storage requirement
CustomizationДоступно в зависимости от предполагаемого применения и операционной среды.

Applications

For large clean manufacturing process-water stations, sanitation systems and multiple-use hot-water distribution networks.

Solutions for Your Application

Peak demand exceeds 100 gpm and outlet temperature collapses.Validate simultaneous fixtures and process draws, then add parallel capacity or storage if the instantaneous peak is higher.
The larger skid cannot be serviced after surrounding piping is installed.Reserve exchanger withdrawal, pump maintenance and control-panel clearances in the plant layout.

Доступные варианты

Specify outlet temperature, demand profile, boiler conditions, exchanger wall, skid materials, pump redundancy, recirculation and controls.

Planning a Packaged Hot-Water Heating Unit 100 GPM specification?

Отправьте нам ваши габариты, условия монтажа, целевые показатели производительности и требуемую отделку поверхности.

Поговорите с нашей командой
Электронная почта WhatsApp WeChat

Главная

Продукция

Новости

О нас

Контакты