Your One-Stop Supplier for Cleanroom Equipment and Aseptic Facility EssentialsInternational Project Support
Open mobile navigationClose mobile navigation
Home / Products / Air Ducts & Air Distribution / PIR Pre-Insulated Air Duct 30 mm Exterior-Duty
zhengfeng-PIR-PRE-INSULATED-AIR-DUCT-30MM-EXTERIOR

PIR Pre-Insulated Air Duct 30 mm Exterior-Duty

Deeper PIR insulation can form part of an outdoor duct assembly when weather and structural details are designed together.
  • Thickest selected PIR wall provides greater thermal separation.
  • Exterior protection can cover joints as well as panel faces.
Request a Quote Browse Products

Combine deeper insulation with a designed exterior enclosure

The 30 mm PIR option offers a thicker integral foam layer between aluminum facings for routes with greater thermal demand. Outdoor use requires an additional exposure design covering the entire assembly. The exterior-duty name identifies that intended configuration; panel thickness and a primed foil face alone do not establish a weatherproof duct.

Separate thermal duty from weather and structural loads

Determine insulation from supply-air temperature, outdoor design conditions, solar exposure and the required heat-gain or condensation limit. Then select weather covering for rain, ultraviolet exposure, movement and impact. Wind uplift, snow or other imposed loads need their own structural assessment, including supports and attachments; they are not captured by an internal air-pressure rating.

Reference constructionExterior detail to define
30 mm PIR sandwich wallDeclared thermal data and approved duct dimensions/reinforcement.
Aluminum faces with primerCompatibility with the selected exterior coating or covering system.
Elastomeric coating or reinforced covering optionComplete system, application conditions, joints, terminations and repair method.
1200 mm wide stock panelsFabrication layout, section lengths and access for installation and maintenance.

The exterior seal must continue around flanges, corners, penetrations and supports. Details should shed water instead of leaving pockets where it can stand. A coating applied only to broad panel faces leaves vulnerable joints untreated. Compatible movement joints and terminations are needed where long runs meet equipment or the building.

Install for inspection over the service life

Keep the core dry during storage and construction. Apply the selected weather system under its approved conditions and protect it from later trades. Provide supports that spread load without crushing panels, plus independent access routes so the duct is not used as a walkway.

Inspect for punctures, split joints, coating deterioration and moisture ingress, particularly after severe weather or rooftop work. Repair the underlying panel where damaged; covering a softened or delaminated section does not restore its original capacity.

Quotation and handover

Provide site exposure, route, dimensions, pressure, temperatures and design loads. Quote thermal panels, reinforcement, weather covering, flashing, supports and tests as a complete scope. Accept against documented material compatibility, exterior detail inspection and agreed duct pressure/leakage performance. Any fire or outdoor durability rating must apply to the offered assembly.

Planning your PIR Pre-Insulated Air Duct 30 mm Exterior-Duty specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Inquiry Form

Home

Products

News

About Us

Contact Us