PIR Insulated Cleanroom Panel 100 mm with 1000 mm Cover Width

The deeper PIR section retains a one-metre cover while requiring matching interfaces.
  • Foam infill avoids a separate insulation lining.
  • Paired metal skins provide finished interior surfaces.
Request a Quote Browse Products

A deeper PIR wall within the same room grid

This 100 mm PIR panel retains a 1000 mm effective cover width while providing a deeper insulated section between pre-painted steel faces. It is intended for process-room partitions where temperature separation justifies more depth than a shallow enclosure. Keeping the cover module consistent helps coordinate the plan, but does not make doors, tracks and connectors from a thinner wall interchangeable.

Compare complete thermal performance

For the same insulation material, more core depth generally increases resistance to heat flow through the panel centre. The U-value of an installed wall also reflects its joints and surrounding interfaces, so doubling nominal depth does not promise a precise reduction in total room heat load. Use declared panel data and operating temperatures, including the effect of the actual foam formulation and measurement conditions.

The 0.5–0.8 mm reference steel range allows face gauge to be selected with handling and contact exposure in mind. Choose coating chemistry for the process and cleaning regimen. The sandwich supplies finished faces and an insulation layer in one component; additional liners may still be necessary where the selected surface cannot meet a particular exposure requirement.

Coordinate movement and service crossings

Temperature differences between the two faces can cause panel bowing. The supported height, restraint and connection arrangement must accommodate the calculated action along with room pressure and equipment interfaces. A deep panel should not be forced flat against incorrectly aligned supports. Large openings also change the load path and require their own framing.

Pipe and duct penetrations need sleeves or framed closures that maintain the seal and insulation around the opening. Equipment supports should be independent or use designed reinforcement. The modular base and L-bar corners must complete a continuous boundary; metal passing across the section can form a thermal bridge.

Maintain and accept the operating boundary

Watch for condensation concentrated at corners, damaged service seals and joint movement during temperature changes. Distinguish a failed joint from an inadequate insulation choice before repairing it. Scheduled inspection should also include coating damage at busy access points.

Quotation should cover the temperature and humidity design basis, panel build, supported layout, compatible deep frames, penetrations, trims and installation. Acceptance combines material and thermal documentation with dimensional, support and seal checks. Fire resistance and loading remain properties of a documented assembly, not consequences of the PIR name or the 100 mm thickness.

Planning your PIR Insulated Cleanroom Panel 100 mm with 1000 mm Cover Width specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Inquiry Form

Home

Products

News

About Us

Contact Us