Motorized Shut-Off Damper DN100 Class 4 24 V 5 Nm
- Direct shaft drive keeps the compact assembly straightforward.
- The gasketed blade seals the circular perimeter at shutoff.
Low-voltage on-off control of a small round branch
The DN100 assembly uses a single circular disc in a galvanized casing, with an EPDM perimeter gasket and a direct shaft-mounted actuator. Its nominal 24 V AC/DC, 5 Nm configuration provides remote open/close control. It suits an accessible service location above a ceiling where operation is commanded remotely but inspection and replacement remain possible.
What the designation does not establish
Class 4 identifies a closed-blade leakage selection under EN 1751. Evidence must identify the actual damper, applicable standard edition, test pressure and conditions. Closed-blade leakage differs from casing leakage and leakage at the installed duct joints. The designation does not mean bubble-tight isolation or a fire/smoke qualification.
| Item | Catalog configuration |
|---|---|
| Connection | DN100 nominal circular duct. |
| Casing/blade | Galvanized casing with single rotating disc. |
| Seal | EPDM perimeter gasket. |
| Actuator | 5 Nm nominal output, 24 V AC/DC supply and on-off command. |
| Options | Mounting platform, compatible position indication and circular connections. |
Five newton metres is an actuator output description, not proof that the damper will seat at every pressure. Select against breakaway, running and seating torque for this assembly, with the manufacturer's required allowance. A generic diameter-band minimum does not replace that check.
Power and position coordination
Specify the actual actuator model, wiring scheme, transformer capacity, running time and required failure position. On-off control alone does not establish spring return; a non-fail-safe drive may remain where it is after power loss. Optional contacts indicate position and must not be treated as leakage sensors.
Align the shaft coupling and anti-rotation support, preserve blade clearance and keep duct fasteners away from the moving disc. Provide service space for the actuator and a sealed connection suited to the actual duct dimensions. EPDM suitability depends on the air stream, temperature and cleaning chemicals.
Service and acceptance scope
Inspect deposits on the seal, coupling slip and full blade travel if shutoff deteriorates. Do not increase the end stop force to hide a damaged gasket. Quote the actuator, body, connectors, mounting hardware, transformer if needed and feedback separately. Acceptance should record commanded and actual positions, failure response, stroke time and the agreed leakage evidence at the duty pressure. Remote operation does not remove the need for physical maintenance access.
Planning your Motorized Shut-Off Damper DN100 Class 4 24 V 5 Nm specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.