Hygienic PVC Cove Skirting 100 mm Deep-Foot
- 50 mm horizontal return
- 100 mm wall protection
- Matched resilient-floor gauges
A broader return for an accessible floor seam
The deep-foot set-in PVC skirting combines a 100 mm upstand with a 50 mm horizontal return. The longer foot moves the joining line away from the tight wall bend, leaving more working room for seam preparation and finishing. Reference lengths are 2000 mm.
Gauge options of 2, 2.5 and 3.2 mm allow the foot to be matched to different resilient floor constructions. Select from the finished section dimensions, not only the nominal floor name. Differences in adhesive thickness or base level can still produce a step even when both coverings have the same stated gauge.
Weld method follows the material pair
The 2 mm reference construction allows a compatible hot- or cold-welded floor joint. That does not establish either method for every gauge or every adjacent floor covering. The skirting, floor sheet, welding material and preparation method must form an approved combination.
For hot welding, follow the specified seam preparation, temperature and trimming sequence for the selected materials. Excess heat or a poorly prepared groove can damage the edge instead of making a sound joint. For cold welding, use the prescribed joining product and curing conditions. Neither process corrects an unsupported or uneven seam.
Floor and wall integration
Bond the profile to a sound, smooth perimeter and keep the horizontal return fully supported. Plan corner pieces or formed joints, vertical length joints and door-frame terminations together. The wider return occupies more floor area, so check nearby fixtures and cut-out positions before fixing.
Where the main floor has an ESD function, maintain its specified grounding and testing arrangement. A PVC skirting should not be assumed to extend the conductive path. For wet-cleaned rooms, assess the complete upper edge, corners, seams and penetrations; the foot dimension alone does not establish water containment.
Price and handover checks
Include the selected gauge and colour, run lengths, waste, adhesive, weld materials, corners, end details and substrate correction in the quotation. Agree the completed seam sample and cleaning method before the main installation.
Inspect for an even floor transition, secure bonding through the curve, smoothly finished welds and closed upper edges and ends. Maintain the perimeter with compatible cleaners and repair lifting or seam damage before liquid enters beneath the return. The broader foot improves joining access, while the quality of the material match and installation determines the result.
Planning your Hygienic PVC Cove Skirting 100 mm Deep-Foot specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.