Heavy-Duty Polyurethane Cement Flooring 6 mm Broadcast
- Nominal 6 mm system
- Base, aggregate and topcoat sequence
- Defined wet-process surface profile
A deliberately textured polyurethane-cement surface
The nominal 6 mm assembly uses a hybrid base layer, graded aggregate broadcast and a dedicated topcoat. This construction is intended for wet process and heavy internal traffic routes, where the surface needs a controlled texture rather than the smooth face of an unbroadcast floor.
Aggregate and seal coverage determine the profile
The broadcast forms peaks and spaces for contact under contamination; the topcoat binds and closes the exposed mineral surface. Too much seal can fill the texture, while insufficient coverage can leave poorly bound or difficult-to-clean areas. Aggregate grading, broadcast coverage, excess removal and seal consumption therefore belong to one specified system.
Where R12 is a project requirement, obtain the corresponding report for the exact aggregate and topcoat arrangement. A laboratory ramp classification does not guarantee safe walking with every site chemical, shoe or cleaning residue. Agree an appropriate assessment of the installed floor and its intended contamination conditions. Do not convert an R class into a pendulum result.
Drainage and cleaning are part of the selection
Texture does not remove standing liquid. Design falls, drain positions and supported terminations so wash water can leave the route. More pronounced texture also requires cleaning equipment that can reach its recesses; an unsuitable cleaning pad may simply pass over accumulated residues. Review a sample with the actual cleaning method before selecting the final profile.
Prepare sound concrete, resolve moving joints and confirm moisture compatibility for the base and any primer. Record material, air and slab conditions against the selected application instructions. Nominal thickness and kilograms per square metre are related, but substrate roughness and broadcast waste prevent a single consumption figure from proving thickness.
Supply scope and handover
A complete quote separates base, aggregate and topcoat, with preparation, coves, drains, joint details and installation controls. Establish consumption from the approved system and a representative trial area. Acceptance includes surface uniformity, secure aggregate, thickness and bond evidence, drainage and the agreed slip assessment after cleaning. Maintain the intended profile when recoating; changing the topcoat or burying the texture can change its performance.
Planning your Heavy-Duty Polyurethane Cement Flooring 6 mm Broadcast specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.