Your One-Stop Supplier for Cleanroom Equipment and Aseptic Facility EssentialsInternational Project Support
Open mobile navigationClose mobile navigation
Home / Products / Cleanroom Flooring / Food-Grade PU Cement Flooring 4 mm R11
zhengfeng-FOOD-GRADE-PU-CEMENT-FLOORING-FINE-BROADCAST-R11

Food-Grade PU Cement Flooring 4 mm R11

A nominal 4 mm PU-cement base, fine broadcast and compatible seal form a textured floor whose traction and cleaning behaviour depend on the complete build.
  • 4 mm nominal build
  • Fine broadcast texture
  • PU-cement hybrid base
Request a Quote Browse Products

A compact broadcast floor for controlled wet service

This nominal 4 mm polyurethane-cement floor uses a mineral-filled base, fine aggregate broadcast and compatible sealing coat. It is a candidate for packaging support rooms and moderate washdown areas where a smooth surface is difficult to manage but an aggressively textured floor would complicate residue removal. The useful distinction is the finished surface profile: both exposed aggregate and the amount of seal coat affect cleaning and traction.

The R11 designation in the product name is a specification target for the complete system. Confirm a test report identifying the actual base, aggregate, sealer and application build before accepting an R11 claim. A laboratory ramp classification is not a prediction of every wet-floor condition, and it does not establish barefoot performance. Food-grade describes the intended application; obtain project-specific suitability documents where food-contact or hygiene certification is required.

How the layers work together

The PU-cement base forms the wearing body. Broadcast grains produce relief, while the finishing coat binds and seals the selected profile. Too much sealing can bury the texture; incomplete coverage can leave a surface that retains soil or sheds poorly bound grains. Assess a representative finished sample after the proposed cleaning process rather than approving loose aggregate alone.

Selection itemListed configuration and decision
Nominal build4 mm; define whether this includes the broadcast and sealing layers. Local slab repairs and slope correction are separate.
SurfaceFine broadcast with compatible seal; agree the cleaned appearance, texture and acceptance method on a sample.
Slip requirementR11 target subject to evidence for the complete proposed build; assess actual footwear, residues and drainage separately.
Preliminary material allowancesAllow approximately 6–8 kg/m² for the base and 0.4–0.6 kg/m² for the topcoat at the planning stage. Treat these as provisional allowances, not a verified installation recipe; confirm aggregate, primer, profile loss and waste separately.
Operating exposureState liquid temperature, dwell time, thermal cycling and cleaning chemicals; a thicker PU-cement system's limits cannot be assigned to this 4 mm build.

Substrate, falls and edge connections

Survey the concrete for weak laitance, oil, old adhesive, moisture and moving cracks before choosing the preparation and primer. Mechanical preparation must expose a sound bonding surface. A moisture-tolerant wearing layer does not make every primer compatible with damp concrete or solve rising water pressure.

Form drainage falls in the supporting construction before applying the wearing system. Coordinate drain flanges, channel edges, coves and doorway levels so water reaches the drain without an abrupt lip. Agree anchorage details for free edges with the selected system supplier; do not taper a mineral-filled floor to a fragile zero-thickness edge. Carry designed movement joints through the finish with suitable joint details.

Cleaning and selection mistakes

Fine texture still needs an appropriate brush or pad, cleaning solution, agitation and removal of dirty rinse water. Establish a method that removes fats or powders without leaving detergent film. Inspect the seal and high-traffic turning points; repair worn areas using a compatible method that restores the agreed texture rather than merely adding a smooth clear coat.

Do not select this version solely because the adjacent floor is called R11. A greasy cooking route, hot discharge point or persistent ponding may require a different surface and thickness. Compare the smooth 4–5 mm option where residue removal dominates and the 6 mm refurbishment option where repair depth and shutdown planning matter.

Quotation and acceptance scope

Request separate allowances for removal, substrate repair, moisture treatment if needed, primer, wearing base, aggregate, seal coat, coves, drains, movement joints and waste handling. Supply floor area, edge lengths, traffic, contaminants and cleaning temperatures. No fixed price or reopening time follows from the 4 mm thickness alone.

Agree material records, installed thickness checks, bond assessment where specified, complete-system slip evidence, finished texture and a drainage/cleaning trial before work starts. Record curing conditions and the release point for washing and traffic. An accepted surface sample and test scope are more useful than an unsupported general claim of a non-slip or hygienic floor.

Planning your Food-Grade PU Cement Flooring 4 mm R11 specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Inquiry Form

Home

Products

News

About Us

Contact Us