Your One-Stop Supplier for Cleanroom Equipment and Aseptic Facility EssentialsInternational Project Support
Open mobile navigationClose mobile navigation
Home / Products / Cleanroom Wall & Ceiling Systems / EPS Insulated Cleanroom Panel 75 mm Four-Side Framed
zhengfeng-EPS-INSULATED-CLEANROOM-PANEL-75-FRAMED

EPS Insulated Cleanroom Panel 75 mm Four-Side Framed

Individual EPS modules need planned component support and closed foam edges.
  • Closed perimeter protects the foam boundary.
  • Individual fabrication accommodates varied module dimensions.
Request a Quote Browse Products

Individually framed EPS infill around room components

The 75 mm four-side framed EPS panel combines a bead-foam core with coated steel surfaces and a closed metal perimeter. It is intended for modular interior layouts with planned glazing, doors and service components. The frame defines each module and protects its edges during positioning; the foam contributes insulation within the broad panel area.

Coordinate component support separately from edge closure

A perimeter closure is not automatically a structural frame capable of carrying a glazed unit or door closer. The section, corner joints, reinforcement and connection to the surrounding structure determine that load path. Small infill pieces around an opening may have a large proportion of metal edge compared with insulated area, which matters where temperatures differ across the wall.

The reference effective widths are 980 or 1180 mm at 75 mm overall thickness. Define actual coverage after the connector is fitted. Face gauge, coating, frame section and EPS grade belong in the approved build rather than being inferred from the panel name. A density value alone cannot determine bond strength, allowable height or fire performance.

Plan the opening before cutting the sandwich

Distinguish the clear service opening from the construction opening needed for its frame and seal. Factory preparation can include a closed foam boundary and local backing. An unplanned cut may remove the metal perimeter, leave unsupported face edges and release loose beads into the room. Penetrating equipment should have a compatible sleeve or frame, with accessible seals for maintenance.

Set the floor track level and support modules while joining them. Forcing an out-of-square module into a bay can stress the bond and disturb the face. Complete the room-side seals after checking fit. Use repair materials compatible with EPS because some solvent-containing products can attack exposed foam behind an apparently sound metal surface.

Scope and evidence for procurement

EPS core is combustible, so a requirement for fire resistance needs evidence for the full framed panel and its installation. The cleanroom application does not itself grant that classification. Quotation should include the opening schedule, frame and reinforcement details, finish, connectors and installation responsibilities.

Acceptance should check module dimensions, squareness, material identification, bond evidence and the actual support of doors and glazing. During service, examine corner seals, impact damage and exposed core. Preserve the approved reinforcement and edge closure when making later alterations.

Planning your EPS Insulated Cleanroom Panel 75 mm Four-Side Framed specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Inquiry Form

Home

Products

News

About Us

Contact Us