Epoxy Self-Leveling Flooring 3 mm Quartz-Filled
- Nominal 3 mm Filled Wearing Body
- Smooth Surface over Mineral Filler
- Wheel-Load and Thickness Coordination
A deeper filled layer for repeated wheeled routes
QF30 uses graded mineral filler within an epoxy wearing body selected at a nominal 3 mm thickness. The cured surface remains smooth; it is not a decorative or traction-producing layer of exposed broadcast grit. The added body compared with a thin coating is useful when a defined wearing depth is needed along repeatedly used routes.
Thickness alone does not establish traffic capacity. Small hard wheels, turning under load and debris trapped beneath wheels can impose concentrated stress. The slab, bond and local support all remain important. A thicker resin layer cannot compensate for loose concrete or a poorly supported joint edge.
Specify depth and quantity separately
| Item | Selection consequence |
|---|---|
| Nominal build | 3 mm wearing layer, with primer and local preparation identified separately |
| Possible thickness range | The original 2–4 mm range is a planning reference, requiring a compatible selected formulation |
| Mineral grading and loading | Control flow, packing and surface formation; use the approved mix |
| Mixed density | Obtain the value for the filled material, not just the unfilled resin binder |
| Traffic specification | Record wheel type, loaded contact conditions, frequency and turning locations |
A geometrically uniform 3 mm layer occupies 3 litres per square metre before allowance for surface profile, local variation and wastage. Convert that volume to mass using the actual filled-mix density. A theoretical consumption figure does not prove that every high spot has the required thickness, and material used in repairs must not be counted as wearing-layer coverage.
Preserve local thickness through installation
Survey the slab and prepare high and low areas before setting the finished level. Frequent trolley paths and junctions need consistent support and depth. Keep movement joints functional and detail threshold transitions so traffic does not strike an unsupported feather edge.
The aggregate-rich mix requires controlled component quantities and adequate blending. Adding extra filler to reduce cost changes flow and resin availability; reducing filler to make spreading easier changes the specified construction. Do not assume a total-solids declaration or a density from another epoxy establishes this mix.
Place material within the approved temperature and working-time limits. Maintain a wet edge and use the specified spreading and deaeration method. If the substrate is porous, establish its primer and pore-filling requirements first rather than relying on the thicker topping to hide escaping air.
Acceptance for the working route
Agree thickness checks, bond assessment where required, surface appearance and joint details before installation. Confirm cure for the planned load and cleaning exposure. A representative loaded trolley trial can reveal objectionable transitions or surface defects, but does not replace the engineering assessment of slab capacity.
Clean with equipment and chemistry compatible with the finish. Remove abrasive grit and inspect concentrated turn zones, joint edges and repairs. If water or oil is routinely present, review the traction requirement and select a suitable surface construction; a dense smooth quartz-filled floor is not inherently slip resistant.
Planning your Epoxy Self-Leveling Flooring 3 mm Quartz-Filled specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.