Double MgO Rock Wool Cleanroom Panel 75 mm Four-Side Framed
- Closed edge framing protects panel corners.
- Double mineral liners back both room surfaces.
A framed module around planned equipment openings
The 75 mm double-MgO rock-wool panel combines two backed metal faces with galvanized members around its perimeter. This modular format allows a wall layout to be built around defined openings, changes in width and equipment interfaces. The frame provides an edge connection, while the internal boards and core remain part of the bonded sandwich.
Frame an opening for its actual loads
An equipment opening interrupts the panel load path. A perimeter closure that protects the core is not automatically a structural support for a pass box, door or heavy service fitting. Identify where the equipment weight and operating forces are carried, and specify reinforced jambs, lintels or separate framing as required. Avoid drawing a misaligned opening into shape with the equipment mounting bolts.
Reference cover widths are 980 or 1180 mm. The proposed facing range is 0.4–0.8 mm steel and the rock-wool reference density is 100–120 kg/m³. Choose the build-up and panel height from the supported wall design. Production length and unsupported span are different dimensions; they need not be equal.
Close all layers at the interface
The MgO boards back both broad faces, but they do not seal exposed rock wool at a field cut. Finished opening edges need continuous closures and compatible joint seals. The detail should accommodate the adjoining frame without leaving a recess that cannot be cleaned or a passage for room air.
Material selection includes the boards, bond, galvanized edges and surface coating. Specify moisture and metal-compatibility evidence for the actual board formulation, particularly where humid operation or frequent cleaning is expected. Factory framing cannot compensate for unsuitable material exposure.
Quotation and acceptance for individual modules
Provide room elevations and an opening schedule showing clear aperture, equipment flange, fixing positions and load information. Separate standard modules, special widths, reinforcement, trims, seals and installation in the quote. State any fire, thermal or acoustic requirement against a corresponding complete-assembly report.
Delivery inspection should verify module labels, diagonals, opening sizes, frame continuity and face condition. After installation, check alignment, sealed interfaces and the load-bearing connections before equipment is commissioned. Maintain accessible seals and inspect around openings for coating damage or delamination following equipment removal or replacement.
Planning your Double MgO Rock Wool Cleanroom Panel 75 mm Four-Side Framed specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.