Your One-Stop Supplier for Cleanroom Equipment and Aseptic Facility EssentialsInternational Project Support
Open mobile navigationClose mobile navigation
Home / Products / Air Ducts & Air Distribution / Combination Fire and Smoke Damper 813 x 914 mm Three-Hour
zhengfeng-COMBINATION-FIRE-SMOKE-DAMPER-813X914-3H

Combination Fire and Smoke Damper 813 x 914 mm Three-Hour

A vertical steel airfoil-blade configuration for a three-hour project requirement, with fire, smoke and operating limits documented for the selected assembly.
  • Airfoil blades provide a defined passage through the open damper.
  • Vertical configuration fits taller shaft and partition openings.
Request a Quote Browse Products

A vertical airfoil-blade selection with a three-hour requirement

The nominal 813 x 914 mm configuration uses steel airfoil blades in a galvanized frame with external actuation. Its Three-Hour designation identifies the requested fire-performance selection. Approval for that duration must cover the supplied model, opening, vertical installation, actuator and barrier detail; the designation alone does not provide that evidence.

Airfoil blades shape the open air passages and can be selected using pressure-loss data. The profile does not inherently produce a longer fire rating, a higher pressure limit or a particular smoke-leakage class. Those characteristics depend on the tested assembly.

Separate the required ratings

Selection itemReference or required documentation
Nominal opening813 mm wide x 914 mm high.
InstallationVertical wall/shaft-plane configuration.
Frame/bladesGalvanized steel frame with steel airfoil blade bank.
Fire selectionThree-hour requirement, verified for the actual assembly and installation.
Smoke selectionDocument the required leakage class and test conditions.
Dynamic operationApproved airflow, closed pressure, temperature and actuation limits.

Fire duration is not a continuous operating-temperature rating. Smoke leakage under a specified pressure and temperature is also different from the fire-resistance test. Compare each project requirement with the relevant approval rather than combining unrelated maximum values from different configurations.

Shaft interfaces and drive access

A tall shaft penetration can leave limited space around the actuator and linkages. Show the drive side, maintenance opening, sleeve projection and duct connection on the drawing. Installation inside or outside the barrier plane must match the approved arrangement; moving the damper away from the wall is not a routine site adjustment.

Use the prescribed supporting/retaining components and expansion clearance. A more demanding rating does not justify packing the gap with extra firestop material unless that exact detail permits it. The actuator, thermal controls and feedback must remain the approved combination for the specified duty.

Maintenance and purchase evidence

Plan safe access for blade, seal, linkage and thermal-device inspection. Replacement actuators and releases must be accepted for the assembly rather than selected only by voltage or shaft fit. Functional tests should confirm the complete blade bank and required alarm/failure sequence.

Quote the identified damper and actuator, sleeve, retaining details, feedback, access and certification documents. Before installation, establish that the three-hour requirement and any Class I smoke selection are supported for this size and orientation. Handover includes installation inspection and functional records; a site closing test cannot establish a fire-resistance duration.

Planning your Combination Fire and Smoke Damper 813 x 914 mm Three-Hour specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.

Talk to Our Team
Inquiry Form

Home

Products

News

About Us

Contact Us