A raised 304 stainless base with water control defined at its floor, panel and field joints.
  • A raised stainless surface protects the panel-bottom zone.
  • Welded construction reduces open joints in the base body.
  • Polished edges support routine wet cleaning.
Request a Quote Browse Products

Raise the panel junction above the immediate wash-down zone

The nominal 170 mm stainless wall base provides a metal boundary below cleanroom wall panels in wet-cleaned production areas. Pressed and welded 304 stainless sections form the base body, with panel-interface options for 50 or 100 mm walls. The raised arrangement can reduce direct wetting of vulnerable panel bottoms when the complete floor and wall junction is properly detailed.

Define what makes the assembly watertight

Stainless steel does not by itself seal the floor joint, field splices, anchors or panel interface. Show the base-to-floor waterproofing connection, corner welds, end closures and upper seal on the installation drawing. The nominal height must be referenced to the finished floor so the panel junction is at the intended level.

Specify support beneath the base and the wall load path. A hollow formed section should not be assigned a load capacity from its height alone. Avoid unfinished cavities or ledges where cleaning liquid can remain.

Match the finish to the cleaning exposure

304 stainless steel has useful corrosion resistance but is not immune to chlorides or aggressive acid and alkaline cleaning conditions. Evaluate the actual chemicals, concentration, contact time and temperature. A polished appearance does not establish a surface roughness value or confirm that weld heat tint and contamination have been removed.

Specify the weld finish and post-fabrication treatment for the assembly. Prevent contamination by ordinary steel grinding debris during installation. After cleaning, follow the selected chemical procedure for rinsing and drying, with particular attention to crevices and the lower floor seal.

Quote and accept the complete junction

Provide the panel thickness, base section, finished level, floor-waterproofing detail and wash-down conditions. Separate formed lengths, corners, welding, finishing, anchors and seals in the quotation. Acceptance should inspect material identity, support, weld continuity, closed ends and the completed water-control interfaces. Agree any water-test method for the installed assembly. During service, repair failed seals, staining or damaged weld areas before repeated washing conceals a developing leak.

Planning your Cleanroom Wall Base Channel 170 mm Stainless Waterproof specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.