Cleanroom Flexible Air Duct DN300 R-8 Insulated

A large flexible terminal connection depends on distributed support and evidence for the selected construction.
  • Broad lined passage for a coordinated terminal connection.
  • The full insulated assembly bends as one component.
Request a Quote Browse Products

A broad flexible connection for a large terminal

This DN300 insulated flexible duct serves a large terminal connection when the route can accommodate a gradual offset and the full insulated outside diameter. Its reference inner bore is 12 inches, approximately 305 mm. A coated woven-fibreglass liner and spring-wire helix form the air passage, with an insulation blanket and metallized jacket outside it. The large bore makes support geometry particularly important: a narrow strap can form a local neck even when both ends appear correctly connected.

Keep the designed area available

Use the actual airflow and installed geometry to calculate resistance. A larger diameter does not make excess length, tight bends or sag harmless. Extend the liner and distribute the load through suitable broad supports, leaving the insulation at its intended thickness. Where a tight direction change cannot be avoided, a supported rigid fitting with a short flexible connection may provide a more predictable route.

Match the collar to the actual bore and provide enough straight engagement for the specified sealing and fastening system. Heavy terminal boxes, dampers and rigid fittings need their own support. Do not rely on the flexible duct to align or suspend them.

Document the particular insulated assembly

The R-8 designation is an insulation selection requirement that needs matching product identification and thermal test evidence. It is not proof of a complete assembly pressure limit. Diameter affects the structural behaviour of flexible ducts, so a smaller-size pressure value cannot automatically be applied to this 12-inch construction. Require separate positive-pressure and suction limits, plus temperature and fire evidence for the delivered variant. A 7.62 m reference supply coil is not an instruction to install that length.

Cold-air service depends on continuous insulation and jacket seals at the large collars. Local blanket compression and damaged jacket areas can undermine the thermal arrangement. The cleanroom application also depends on the actual liner, the cleaning method and whether final filtration lies downstream; the name alone does not determine hygiene suitability.

Purchase and maintain an inspectable connection

State the route, terminal connection dimensions, design airflow, pressures and required insulation in the enquiry. Include supports, collars and sealing materials in the quoted scope. Inspect the liner, blanket and jacket before installation and verify the assembled route for restrictions and leakage. During service, investigate sag, condensation and damaged seams; replace deteriorated sections where an approved repair cannot restore the required assembly. Confirm final airflow at the connected terminal after the system is balanced.

Planning your Cleanroom Flexible Air Duct DN300 R-8 Insulated specification?

Send us your dimensions, installation conditions, performance targets and required surface finish.