Cleanroom Cove Base Skirting R60 PVC-Clad
- The PVC covering continues over the radius.
- An H84 support section coordinates the covered base assembly.
- Aluminum beneath the covering maintains the cove shape.
Carry the resilient flooring through the curved base
This R60 arrangement supports PVC flooring over a rounded wall-base transition. The aluminum components establish the shape while the PVC remains the exposed surface. It is useful where the perimeter should continue the selected resilient floor finish, with seams and corner pieces detailed as part of that flooring system.
Set the finished height from the assembly
The proposed support uses 6060-T6 aluminum and an H84 floor profile beneath a nominal 60 mm radius. H84 identifies the support section. The completed upstand height depends on its position relative to the finished floor, covering thickness and upper termination; it should not be specified as 84 mm solely from the profile designation.
Select the actual PVC covering and its approved bending and bonding method. A flexible sheet still needs continuous support through the curve. Unsupported areas can flex under cleaning pressure, strain the adhesive and concentrate stress at a seam.
Adhesion, welded seams and the wall termination
Prepare the metal support and use an adhesive approved for both that substrate and the flooring. Follow the flooring-system requirements for forming the curve, installing internal and external corners and joining seams. Heat welding and chemical sealing are not interchangeable options for every PVC product.
Plan the upper termination so cleaning liquid cannot enter behind the upstand. The floor-to-wall detail also needs continuity at door jambs and three-way corners. If the floor has an ESD function, specify the electrical role of the upstand separately; its appearance does not prove continuity with the grounded floor.
Supply and completed-work checks
Send the floor product reference, thickness, finished level, upstand height and corner schedule. Separate aluminum supports, PVC, adhesive, welding materials, terminations and installation in the quotation. Accept against an approved sample showing full contact over the curve, sound seams and closed edges. Inspect for bubbles, detached covering, split corner welds and opened top seals during maintenance, and use the flooring-system repair procedure to restore the complete junction.
Planning your Cleanroom Cove Base Skirting R60 PVC-Clad specification?
Send us your dimensions, installation conditions, performance targets and required surface finish.