Continuous heavy-duty layer
The mineral-filled hybrid forms a substantial body across the repair area rather than adding only a thin maintenance coating.
The fast-return version places a nominal 6 mm polyurethane-cement course using a flow-applied method. Its lightly textured face and greater depth distinguish it from the smooth 4-5 mm option and the thin fine-broadcast system. The formulation is intended for refurbishment schedules where the floor must return to service promptly, with the actual release time governed by substrate temperature and the installed material's curing conditions.
The mineral-filled hybrid forms a substantial body across the repair area rather than adding only a thin maintenance coating.
Flow application can cover open working bays while trowel finishing manages edges and transitions around fixed details.
The selected fast-return system is relevant to planned shutdowns, provided preparation and curing are included in the work window.
| Binder System | Polyurethane-cement hybrid |
|---|---|
| Nominal Thickness | 6 mm |
| Wearing-Layer Consumption | Approximately 13-15 kg/m² |
| Application | Flow applied and finished |
| Surface | Lightly textured |
| Primer | Compatible polyurethane-cement system primer |
| Layer Function | Industrial wearing screed |
| Floor Format | Seamless in-situ layer |
| Substrate Application Temperature | +12 to +30 °C |
| 사용자 정의 | 의도된 응용 프로그램 및 운영 환경에 따라 사용할 수 있습니다. |
Consider for food-plant repairs, material routes and wet processing support areas where shutdown duration matters. Organize drainage, joint repairs and perimeter terminations before the screed is placed; fast curing will not compensate for unfinished preparation or make an unsuitable base stable.
Plan the flow-applied wearing course with compatible preparation and primer stages, using the actual temperature to schedule reopening.
Set the repair depth and termination before placement so that the full 6 mm course meets the neighboring surface correctly.
Provide repair dimensions, operating temperatures and the expected wheel traffic. Select color, cove returns and drain-edge details together so that the completed patch functions as part of the surrounding process floor.
치수, 설치 조건, 성능 목표 및 필요한 표면 마감을 보내십시오.